Orem's neighborhoods range from established central areas like Sharon Park to newer growth near the north and east benches, and many homes — especially those built before the 1990s — have basements that were never finished into livable space. Orem allows accessory apartments citywide, as long as the property owner lives in either the main home or the accessory unit, which makes basement ADUs one of the most straightforward ways to add rental income or space for family in Orem. Canterwood Construction builds these to Orem's accessory-apartment requirements from day one — separate entrance, full kitchen, code-compliant egress — and we handle the permitting and inspection process directly with the city so your scope, budget, and timeline are locked in before we start. Most jobs run 7–8 weeks from contract to finished space.

Why Choose Canterwood Construction

  • Mapleton-based, so we're not learning the city's permitting process on your job

  • ADU and rental-suite layouts designed for separate entrances and code-compliant egress

  • 17+ years construction experience, BYU construction management background

  • Expert communication so you are never left guessing during the construction process

Frequently Asked Questions

Do I have to live in my Orem home to legally rent out a basement apartment?

Yes — Orem requires the property owner to occupy either the main house or the accessory apartment. We'll walk through what that means for your situation during your estimate.

Is my basement already set up to become a legal accessory apartment?

Many older Orem basements have some of what's needed already (separate access, rough plumbing) but still need updated egress and code items — we'll assess that on a walkthrough.

How long does a basement or ADU project take in Orem?

Typically 7–8 weeks depending on scope.