top of page

Basement Finishing & ADUs in American Fork, Utah

American Fork's mix of established neighborhoods near downtown and newer construction toward the foothills means a lot of homes here have basements that were either never finished or are overdue for a remodel. Canterwood Construction turns that space into basement apartments and Accessory Dwelling Units built for long-term rental, a mother-in-law suite, or multigenerational living — complete with separate entrances, full kitchens, and code-compliant egress. We're currently completing two basement projects in American Fork, so we know the city's permitting and inspection process firsthand. Most jobs run 7-8 weeks from contract to finished space.

Why Choose Canterwood Construction

  • Currently building two basement projects in American Fork — ask us for a local reference

  • ​ADU and rental-suite layouts designed for separate entrances and code-compliant egress

  • 17+ years construction experience, BYU construction management background

  • Expert communication so you are never left guessing during the construction process

Frequently Asked Questions

American Fork has a lot of established, curb-appeal neighborhoods near downtown — will a basement ADU change the outside of my house?

No exterior changes are typically needed for a basement ADU — we work within your existing footprint, adding a code-compliant egress window when required, so your home's curb appeal stays the same.

My American Fork home was built decades ago — can an older basement even meet current ADU code?

Yes, we specialize in bringing older American Fork basements up to current code, handling egress, ceiling height, and permitting so your finished space is fully compliant.

How long does a basement or ADU project take in American Fork?

Typically 7–8 weeks depending on scope.

bottom of page